On 08/04/2026 12:33, Mal Rowe wrote: > Bridge Rd Richmond was relayed in January 2021 using the now standard > Melbourne technique of concrete to sleeper height, fill with crushed > rock / crushed concrete to just below rail top and a bitumen top. > > This weekend the roadway in the tramway lanes will be resurfaced. > Here are a couple of pics of the work today. The old top layer (asphalt) has been lifted and the surface scarified. A small roller is running to consolidate the crushed rock level. As I said, it looks a bit light for the job. See first pic. Second pic shows the top layer of asphalt being applied. I will be interesting to see how this holds up over the next 12 months or so. Mal Rowe - civil engineering voyeur