Re: [TramsDownUnder] Essendon Depot Question

On 27/08/2025 17:54, timmy1041 wrote:
> Mal,brand new toilets were installed in April/June 2024 which I am
> sure also included a short extension to the track to enable 1  x G  &
> 1 x Z Class or even possibly 2 x G's to sit in the shunt at once.
>
Hi Tim,

That was certainly the plan, but apparently a decision to install two
toilet cubicles rather than one resulted in a siding that now only fits
one tram.

See attached pic with inset showing the detail of the sign at top left.

The solution could be to put back the crossover that used to be there so
that trams to and from West Maribyrnong can shunt independently of the
rout 82 terminus.

Mal Rowe