On 27/04/2025 17:15, 'David Batho' via TramsDownUnder wrote:
Thank you to every one for your replies. Now to my next, taxonomical, question: is it a railway or a tramway signal?! (It would have been operated by the railway signalman, I presume, or operated automatically when the gates went down, but applied to a tramway.)
I'll leave the taxonomy questions to others. I have enough trouble trying to separate Railway - Tramway and Light Railway!
Here's a pic of the lever frame at Kooyong in 2004, when the crossing was still manually controlled.
Perhaps one of the signal gurus on the list may be able to tell us which lever did what.
Mal Rowe - who once applied for a job as a signalling engineer.
No comments:
Post a Comment
Note: only a member of this blog may post a comment.